Thursday, May 14, 2020

author photo

M3G ferry 2.jpg

The M3 Amphibious Rig is a self-propelled amphibious bridging vehicle that is used for the projection of tanks and other vehicles across water obstacles.

Originally developed by the German firm Eisenwerke Kaiserslautern (EWK, since 2002 acquired by General Dynamics European Land Systems), it succeeded the conceptually similar M2 made by the same company. Like its predecessor, the M3 traverses roads on its four wheels, deploying two large aluminium pontoons for buoyancy on water.

Development of the M3 began in 1982, with the final prototype being delivered 10 years later in 1992. A first order of 64 serial vehicles was made in 1994, and it entered service with the German and British armies in 1996. Since then, the M3 has also been adopted by the armies of the Republic of China (Taiwan) and Singapore.

An upgraded version, known in some circles as the M3G, is in service with the ROC and Singapore armies. This version features an armoured cabin, NBC protection, an air conditioning system and a special tropical kit.


The M3 is self-deployable by road, operating as a 4x4 wheeled vehicle with a maximum road speed of 80 km/h. It is driven into the water for amphibious operation, for which it deploys two large aluminium pontoons, unfolding them along the length of its hull. In water, the M3 is propelled and steered by 2 fully traversable pump jets at speeds of up to 14 km/h.

Multiple rigs may be joined by long connectors called "ramps", 4 of which are carried on each vehicle, to form a bridge across a water obstacle. 8 M3 Rigs will bridge a 100m water gap this way, and can be traversed by vehicles up to and including the heaviest 60+ ton main battle tank like the Leopard 2A6 and Challenger 2. Alternatively, just 2 Rigs may be joined to create a ferry capable of carrying a similar load across much wider water gaps. 3 Rigs joined together may carry up to the equivalent of 2 such MBTs.

The M3 Amphibious Bridging Vehicle saw its first combat actions in Operation Telic, Britains military operations in the Iraq War (until withdrawal in 2011). From 25 March 2003, 412 Troop(V),23 Amphibious Engineer Squadron, of 28 Engineer Regiment of the Royal Engineers ferried elements of 3 Commando Brigade across the Shatt Al-Basrah waterway, enabling their continued advance on the Iraqi city of Basra. A subsequent riverine crossing at the Rumaila oil fields was also undertaken by the M3. This action transported three AS90 self-propelled howitzers in support of 16 Air Assault Brigade of the British Army.

M3 Amphibious Rig 1

M3 Amphibious Rig 2

M3 Amphibious Rig 3

M3 Amphibious Rig 4

M3 Amphibious Rig 5

Complete article available at this page.

your advertise here

This post have 0 komentar


EmoticonEmoticon

Next article Next Post
Previous article Previous Post

Advertisement

Themeindie.com